Construction of Lodge, Indian Lodge, c. 1934
Halfway to completion, the lodge shows various stages of construction and the on-site staging of building materials. Enrollees have stacked the peeled pine vigas (joists), a tool bin, and a construction office on the right. Working on the roof, they apply the adobe mud surface. Newly framed floors and doorways and stacked adobe bricks stand ready for use in construction.
Archives of the Big Bend